Volver al contenido

Checklist

Checklist semanal de scouting del huerto para equipos pequeños

Una secuencia semanal práctica para un supervisor y una cuadrilla pequeña a pie.

Getting Started 6 min de lectura Farmbit Field Team · Updated 2026-08-24

Section 1

Start with the decision, not the map

Write down what could change this week's field plan: a block to walk first, a crew assignment to move, or a question that needs ground confirmation. A small team cannot inspect every row at once, so the checklist should produce a first move rather than a complete inventory.

Section 2

Triage one questionable block

Choose the block with the highest chance of changing the day and record why it is ahead of the others. Use a broad satellite pass as a screening input, but keep the block, date, recent field activity, irrigation history, and known crop stage beside the signal so the team does not mistake colour for cause.

Section 3

Brief the walking team

Give the supervisor a short route order, the visible symptom or contrast to check, and the evidence that would lower the priority. A useful brief lets the crew say what they checked, where they started, and what should happen next without translating a dashboard during the walk.

Section 4

Close the loop before next week

After the walk, record whether the remote signal was confirmed, explained by a known condition, or not useful. Carry that result into the next ranking; otherwise every Monday starts with the same unresolved map and the team cannot learn which signals deserve attention.

Next move

Inspect the sample run after you read the guide.

The guide explains the logic. The completed sample run shows whether Farmbit turns that logic into a field-ready brief.

More guides